{"id":43945,"date":"2020-01-03T11:24:34","date_gmt":"2020-01-03T11:24:34","guid":{"rendered":"https:\/\/pennstudiostaging.co.uk\/toptec\/?post_type=projects&#038;p=43945"},"modified":"2025-04-17T12:22:34","modified_gmt":"2025-04-17T11:22:34","slug":"carres-grammar-school-learning-resource-centre","status":"publish","type":"projects","link":"https:\/\/pennstudiostaging.co.uk\/toptec\/case-studies\/carres-grammar-school-learning-resource-centre\/","title":{"rendered":"Carre&#8217;s Grammar School &#8211; Learning Resource Centre"},"content":{"rendered":"","protected":false},"excerpt":{"rendered":"<p>The Learning Resource Centre currently seated 30 students, however the tables were too long and narrow and it did not ultilise the space to the fullest, making the space appear small. The school wanted to change the layout and the shape of the tables in order to break up the space as it was becoming problematic getting students in there. They also had a specific IT requirement that students could use whilst sat at the desk.<\/p>\n","protected":false},"featured_media":82977,"template":"","case_study_category":[],"class_list":["post-43945","projects","type-projects","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/pennstudiostaging.co.uk\/toptec\/wp-json\/wp\/v2\/projects\/43945","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pennstudiostaging.co.uk\/toptec\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/pennstudiostaging.co.uk\/toptec\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pennstudiostaging.co.uk\/toptec\/wp-json\/wp\/v2\/media\/82977"}],"wp:attachment":[{"href":"https:\/\/pennstudiostaging.co.uk\/toptec\/wp-json\/wp\/v2\/media?parent=43945"}],"wp:term":[{"taxonomy":"case_study_category","embeddable":true,"href":"https:\/\/pennstudiostaging.co.uk\/toptec\/wp-json\/wp\/v2\/case_study_category?post=43945"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}